AI may compress discovery, design and drafting. But drugs, reactors and big projects still have to clear review. This page looks at how long those reviews take, what is being reformed, and why slow review exists.

  • 1,600+AI-enabled medical devices FDA had authorized for marketing as of September 2026Source [6]
  • $1.14 billionMedian R&D cost per new drug in a 2009 to 2018 sample (2018 dollars), versus $2.6 billion in the Tufts estimateSource [1]
  • 9.6%Overall likelihood of approval for a drug candidate entering Phase I (BIO study of 2006 to 2015)Source [3]
  • 18 monthsMaximum time for an NRC decision on a new reactor application under the May 2025 executive orderSource [10]
  • 2.4 yearsMedian time from notice of intent to final EIS for 2021 to 2024, per CEQ (3.1 years for 2017 to 2020)Source [13]

FDA: the long road from molecule to market

Drug development is slow, expensive and mostly ends in failure. A BIO study of 2006 to 2015 found that a candidate entering Phase I had a 9.6% overall likelihood of approval [3]. A 2014 Tufts Center for the Study of Drug Development report put the cost of an approved drug at about $2.6 billion, counting the ten-plus years a candidate spends in development, based on 106 randomly selected drugs from 10 companies [2]. A JAMA study of the 355 drugs approved from 2009 to 2018 put the median at $1.14 billion and the mean at $1.56 billion in 2018 dollars. It had R&D data for only 63 products (18%), and its authors say smaller firms were probably overrepresented [1]. The two estimates differ by more than a factor of two, and both include the cost of failures, so neither is the bill for a single typical drug.

The FDA has several ways to go faster. Priority review sets a goal of acting on an application within 6 months [4]. Fast track and breakthrough therapy are designed to speed development and review of drugs for serious conditions, and accelerated approval can rest on a surrogate endpoint instead of a long wait for clinical outcomes [4]. The tradeoff is that faster paths lean on earlier or weaker evidence, so more of the risk shifts to after launch.

The agency is also using AI on itself. In June 2025 it launched Elsa, a language-model tool "designed to assist with reading, writing, and summarizing," for tasks like summarizing adverse events and comparing labels [5]. In January 2025 it issued draft guidance on AI used to support regulatory decisions about drugs, its first on the subject, with a risk-based framework for judging whether a model is credible for a particular use [7]. On devices, the FDA says it had authorized over 1,600 AI-enabled devices as of September 2026 [6].

Here is where the bottleneck moves. If AI makes finding and designing candidates much cheaper, the scarce step becomes proving a drug works in people. The Institute for Progress argues that trials take years and often fail to finish, and that they may account for about 60% of development costs, though it notes that cost methods are disputed [8]. Optimists say AI tools for reviewers could speed approvals without lowering standards, and that trial reform is the real prize [8]. Skeptics respond that biology, not paperwork, sets the pace of many trials, since some outcomes take years to observe. Both can be true, and the evidence on whether AI-designed drugs succeed more often in late-stage trials is still thin.

NRC and nuclear: licensing at the edge of a demand surge

The Nuclear Regulatory Commission reviews reactor designs and licenses plants. On May 29, 2025 it issued a Standard Design Approval for NuScale's US460 small modular reactor [9]. That completed the staff's technical review of the design, which other applications can now reference. It is not a license to build or run a plant [9]. Congress had already pushed the agency to move faster on advanced reactors in the ADVANCE Act of 2024.

In May 2025 an executive order told the NRC to set fixed deadlines of no more than 18 months for a final decision on an application to construct and operate a new reactor, and no more than 1 year for a decision on continued operation of an existing one [10]. It also told the agency to finish the rule changes within 18 months, which meant late November 2026 [10]. Some of that work is done. A final rule published on November 3, 2026 streamlines contested licensing hearings, citing both the ADVANCE Act and the order, and takes effect on December 3, 2026 [22]. Other pieces were still at the proposal stage when this page was written, so the order's deadline looks only partly met.

Supporters see fixed clocks as overdue for an agency that licensed few new reactors in decades. Critics worry that a deadline set from outside pressures an independent safety regulator to approve designs it has not finished examining. Which side is right depends on whether the old pace reflected real safety work or process for its own sake, and that will be tested on first-of-a-kind designs.

AI-driven electricity demand is part of why this matters. In September 2024 Constellation announced a 20-year power purchase agreement with Microsoft to restart Three Mile Island Unit 1, renamed the Crane Clean Energy Center, which it then expected online in 2028 [12]. The NRC issued its final environmental assessment and finding of no significant impact on September 18, 2026, while four licensing actions remained under review and no restart decision had been made [11]. Power and grid questions are covered on the AI infrastructure sister site, so this page stays on the regulatory side.

NEPA and permitting: shorter clocks, fewer rules, more deference

The National Environmental Policy Act requires agencies to study environmental effects before major federal actions. A CEQ release from the last days of the Biden administration reported that the median time from notice of intent to final environmental impact statement (EIS) was 2.4 years for 2021 to 2024, versus 3.1 years for 2017 to 2020 [13]. Note that this is an administration grading its own record, and that medians hide the long tail of reviews that take far longer.

In 2023 the Fiscal Responsibility Act wrote limits into the statute: 75 pages for environmental assessments, 150 pages for an EIS, or 300 for one of extraordinary complexity, not counting citations or appendices. It also set deadlines of one year for assessments and two years for EISs, and let a project sponsor petition a court when an agency misses one [14].

Courts and CEQ then changed the legal ground. In Marin Audubon Society v. FAA (D.C. Cir. 2024), the court described CEQ's NEPA regulations as beyond its authority to issue as binding rules [16]. In February 2025 CEQ issued an interim final rule removing those regulations, effective April 11, 2025, saying it had "serious concerns about its statutory authority" to keep them [16]. Each agency now relies on its own NEPA procedures. On May 29, 2025, the Supreme Court decided Seven County Infrastructure Coalition v. Eagle County 8 to 0, with Justice Gorsuch not taking part. It held that the D.C. Circuit had not given the Surface Transportation Board the "substantial judicial deference" required in NEPA cases [15].

Supporters say these changes cut litigation risk and delay. Critics expect thinner analysis and more inconsistency across agencies, and they warn of new lawsuits over how each agency's procedures apply. Tunnel permitting is covered on the tunnels sister site.

Regulators using AI themselves

If review itself is the bottleneck, AI could help the reviewers. Pacific Northwest National Laboratory's PermitAI project, funded by the Department of Energy, is building a "one-stop data platform offering public datasets and artificial intelligence (AI) modules as shared services" for environmental review [17]. PNNL reports that it turned NEPA records into an open dataset of about 120,000 documents from 60,000 projects, and that more than 200 federal evaluators were testing the AI component as of August 2025 [18]. PNNL says staff could reach cross-agency data "in minutes instead of months," but it reports no measured savings in review time, so treat that as a goal and not a result [18].

In May 2025 CEQ issued a Permitting Technology Action Plan "to modernize Federal environmental review and permitting processes" [19]. The FDA's Elsa, described above, is the same idea applied to drug review.

Technology can only help so much if delays come from legal risk, unclear authority or short staffing. Current tools are better at searching, reading and summarizing than at the judgment calls that make review slow. They also raise a new question that agencies have barely begun to answer, which is how much a reviewer may rely on a model's summary of evidence the reviewer has not read.

The case for caution, and the case against

Slow review has a history. In the early 1960s FDA reviewer Frances Kelsey refused to approve thalidomide because of inadequate evidence. Researchers abroad later linked the drug to severe birth defects, and it was never marketed in the US [20]. That near miss helped pass the 1962 Drug Amendments, which fundamentally changed drug regulation [20]. Defenders of strict review argue that this is the system working: the cost of caution is delay, while the cost of error can be irreversible harm at scale. Nuclear regulators carry a similar memory of the 1979 accident at Three Mile Island Unit 2.

Critics make the mirror argument. Economist Sam Peltzman concluded in 1974 that the 1962 rules had significantly reduced the introduction of effective new drugs, and critics describe a "drug lag" in which patients wait for medicines already available abroad [21]. The same account notes that a former FDA commissioner described intense congressional pressure against approving drugs [21]. A regulator is blamed for a harmful approval but rarely for a helpful drug that arrives late, since nobody can name the patients who went without it. That asymmetry, critics say, pushes agencies toward too much caution.

A fair summary: the speed of review is a policy choice about which errors to risk. AI may lower the cost of doing review well, but it does not settle that choice. And a faster approval on paper still has to survive the clinic, the courtroom and the construction site.

Watch

Picked for this page. The full list is on Videos.

Further reading

Sources

  1. JAMA, Estimated Research and Development Investment Needed to Bring a New Medicine to Market, 2009 to 2018 (Wouters et al., corrected September 2022)
  2. Scientific American, Cost to Develop New Pharmaceutical Drug Now Exceeds $2.5B (Tufts CSDD study)
  3. BIO, BIO Releases Largest Study Ever on Clinical Development Success Rates (May 25, 2016)
  4. FDA, Fast Track, Breakthrough Therapy, Accelerated Approval, Priority Review
  5. FDA, FDA Launches Agency-Wide AI Tool (Elsa), June 2, 2025
  6. FDA, Artificial Intelligence-Enabled Medical Devices
  7. FDA, FDA Proposes Framework to Advance Credibility of AI Models Used for Drug and Biological Product Submissions (January 6, 2025)
  8. Institute for Progress, The case for clinical trial abundance
  9. Federal Register, NuScale Power, LLC, US460 Standard Design Approval (NRC, June 4, 2025)
  10. Federal Register, Ordering the Reform of the Nuclear Regulatory Commission (May 29, 2025)
  11. NRC, Christopher M. Crane Clean Energy Center page
  12. Constellation Energy, Constellation to Launch Crane Clean Energy Center (September 2024)
  13. White House CEQ archive, New Data Shows Biden-Harris Administration Improved Speed of Federal Permitting and Environmental Reviews (January 13, 2025)
  14. US Code, 42 U.S.C. 4336a, Timely and unified Federal reviews (added by the Fiscal Responsibility Act of 2023)
  15. SCOTUSblog, Seven County Infrastructure Coalition v. Eagle County, Colorado
  16. Federal Register, Removal of National Environmental Policy Act Implementing Regulations (CEQ, February 25, 2025)
  17. PNNL, PermitAI project
  18. PNNL, PermitAI ushers in new era of faster, better federal permitting (August 21, 2025)
  19. White House, Trump Administration Launches Permitting Technology Action Plan (CEQ, May 30, 2025)
  20. FDA, Frances Oldham Kelsey: Medical Reviewer, Famous for Averting a Public Health Tragedy
  21. Econlib, Drug Lag (Concise Encyclopedia of Economics)
  22. Federal Register, Streamlining Contested Adjudications in Licensing Proceedings (NRC final rule, November 3, 2026)

Last reviewed November 26, 2026. Spot an error? Use Contact in the header.